The Escalation activity contains two branches by default: a primary branch and an escalation branch. You can add escalation branches.
Note: The left-to-right order in which branches appear in the Designer Pane does not affect the order in which Escalation activity branches run. The primary branch will always run initially and escalation branches will run based on their timeout periods.
To add an escalation branch
This documentation is specific to version 9.0. You can find the most up-to-date help files for the latest version at Current Online Laserfiche Product Help Files. For further help or feedback, please see the Laserfiche Support Site. |
© 2013 Laserfiche |